Hadera Project

The plant is under construction, using cogeneration technology (producing both electricity and steam) and is a two‑fuel plant (natural gas with diesel oil as backup) with an installed capacity of 144 MW.

which began operations in July 2020.

The main equipment at Hadera is manufactured by General Electric. The power plant meets the most stringent environmental standards.